A detailed introduction to the operation proc ‍®λess of the filling and sealing machine

Author: Click:777 Release time:2020-05-28

Filling and sealing machine is an integrated pac¥✘¶kaging equipment for filling cosmetics, food,  ≥ πchemical and other industries. It has a w↓®®ide range of applications. Then, the next stepσ♦π  is to explain the use process of this equi"✘♣pment.:

1. Check whether the components are intactλ<β and firm, whether the power supply☆©← voltage is normal a✔↔nd whether the air circuit is normal.

2. Check that the sleeve chain, cup hol≠→der, cam, switch and color code sβλ ★ensor are intact and se<ε♥cure.

3. Check whether the mechaniΩ÷&₩cal parts are connected correctly and lubri™‌cated.

4. Check whether theβ∑ upper pipe station, pr≠™essure pipe station, dimming ​≈€station, filling stat∏®←♣ion and sealing station are co™εordinated.

5. Clean up tools and other o δbjects around the equipment÷≈.

6. Check whether the parts of the ≈≠€&feeder group are intact and firm.↑↑ 

7. Check that the co≤±​ntrol switch is in the original position, th₩•♠>en use the manual roulette machine to determin♥​'e if there is any problem.

8. After confirming that everything in th"®ε€e previous process is normal, turn on the pow ®λer supply and the air valve, and gentlπ≈≠y push the machine for trial operat✔≤λ≈ion. First, operate at a low spee'$ d, and then gradually increase to♣≤"☆ the normal operation speed after evδ∑§ erything is normal.

9. The upper tube station adjusts the s<αpeed of the upper tube motor so that the speed↕™≥₩ of the electric pul₹∑l rod matches the speed×≠ of the machine and m®±≤aintains the operation of thβ↕♠e automatic lower tu★₹≤λbe.

10. The pressure tube station drives theγ↕​ pressure head to operate at the same ✘±time through the up and down reciprocating motio↕¥n of the cam linkage mechanism t$©©o press the hose to the correct position.

11. When reaching the lighting position, please u∏γse a trolley to reach t®γhe lighting alignment s≠↑β←tation, rotate the lighting alignment camεβλ to approach the switch toward the lighting<≥'¥ cam, and make the light beam€≥ of the photoelectric switch illσ‍γuminate the center of the color mark. The d®γ→istance is 5-10 millimeters (mm).

12. The gas station is w♣©♣‌hen the hose is lifted in the lighti↑♥ng station, the probe tube proximity switch ‌$♠on the top of the jacking cone will open the sign≈₩λ§al through the PLC, and then work through tα£he solenoid valve. When the end of the ♦π©hose is 20mm away, the paste ®‍will complete the filling and draining"±™> of the body.

13. First loosen the nut to adjust the fill volu∑→φ≤me, then increase outward as you tighten the oppoσ☆→€site screw and move the slider of the travel£↕​ arm. Otherwise, adjust inward and lock t♠∞he nut behind.

14. The tail sealing station can adjε≈<ust the upper and lower positions of the☆​ tail sealing tooling fixture a< 'ccording to the requirements of the pip≥§eline, and the gap between the ♦¶tail sealing tooling is about 0.2mm.

15. Turn on the power supply and air sup★​ply, start the automatic opαφ© erating system, and then enter the autom☆φatic use of the filling and se‍λ✘aling machine.

16. It is expressly forbiddλ•‍"en for non-maintenance pe¶∑rsonnel to arbitrarily adjust ₹♠each setting parameter®±. If the settings are not correct, the dev∞≥ice may not work properly a≤☆β nd in severe cases may da©₽©mage the device, if adjustment is α≠βrequired during the application field, it must be→≈ adjusted when the device is out of operΩ₹λation.

17. It is expressly forbidden to adjust th₹Ωe filling and sealin®αγ♦g machine when the equipment is in oper€☆<ation.

18. Stop pressing the "Stop" butto ✔≠£n, then turn off the power switch and gas×∑≤ supply switch.

19. Clean the paper feeding device and the fi♣§™δlling and sealing machine device.

20. Record and query  ₹the operation status and dailδ♥≈y maintenance of the Ω↕≠equipment.