gogogo高清完整版_gogogo在线高清免费完整版_GOGOGO免费国语完整版_gogogo高清在线观看_gogogo手机高清在线观看_GOGOGO高清在线完整版_GOGOGO在线高清免费完整板_GOGOGO高清在线播放免费观看_GOGOGO免费高清完整版_GOGOGO免费完整国语_GOGOGO免费完整国语版_GOGOGO高清在线播放免费观看如果奔跑是湘

Hello, welcome to the official website of ©★±Shanghai sanhuai Internati ≥ onal Trade Co., Ltd!

National consultation hotline

+86-021-62411689

Precautions for the operation steps§‌₹ of metal hose filling and s®₩$ealing machine

Author: Click:707 Release time:2022-07-20

Precautions for the ope♦≤ration steps of metal hose filling and sealing machine:

1. Clean up the debris in the hopper, ad•Ωd materials, and put the hopper filler cover¥$​≤ in place;

2. Turn on the power of the metal hose fillin¶≤§♠g and sealing machine✘ ¶, press the main power switch, the counter→←≥ displays 0; when the main power switch is pres♣γsed, the inverter dis σplays "OFF". When the material rea±∑₹​ches the desired temperature, press the "Ruπ©n" button on the inverter, a∞→©"nd the inverter displays "LS". At ≠'≤this time, turn the inverter   £knob clockwise (do not damage th‌εe inner tooth surface of the kno↕€< b with too much force and slip), th'→±e motor will start, ≥¥λ♥the indexing plate will run, ✘​↔↑and the tail sealing mec¶₩hanism will start running<φ∑ (the inverter knob can be used at any time ↕≥during work. Adjust to a∏✘ suitable running speed);

3. Press the filling button of the metal hose filΩ↑ling and sealing machine (the phot&✘±oelectric probe starts to work) ₽ to start the intubation work (the ©≤<Ωmachine manually inserts the tube). When th™"e turntable drives the empty tube to the fi ☆Ωσlling nozzle, the photoelectric probe rβ©¥‍eceives the signal and starts f≥σλ₩illing (filling the tube hold↑β€±er without tube). When the metering±→ β pump completes an actiΩ on, the micro switch r‌ק'eceives the signal and the filling stops. T₩™"he metering pump runs once€♥  and the counter count& ±s once (the counter caε₩★n be reset and counted again at∞♦ any time); this cycle. (The filling of the new m₽™achine is to discharge the air in the me≥¥  tering pump, so it is em$ £‌pty filling);

4. Check the filling am&↓αount, if there is a differσ& ence, the measured value should be  ↕adjusted.

5. After the metal hos§♠πe filling and sealing machi ↔βne is completed, turn of"±δ¥f the filling switches in turn, €​turn the inverter knob counterc¥‍★lockwise until the indexing plate stops run↕∑ning and cut off the&∞ power supply.

During the operation of the metal hose filling"±≠¥ and sealing machine, do not touch€♠∑ the operating parts with your ha₹​Ωnds to avoid accidents.★±¥∞ After adjusting the <<♠♣measured value, be sure to lock the nu₩§ t. If there is any abnormal response duφ‌♥ring the operation of the metal hose fλ♣ ₩illing and end sealing machine, the machi ☆₽ne will not start until the cause is foun₩©®'d. When filling large volume c ₩÷₩ontainers, the diameter of the fill↔≥₽ ing nozzle should not be too small to prevent t₽∞™‌he rubber spray or nozzle from being damaged by₹£↓ excessive pressure duriσ&∞ng filling.

+86-13386259279
  • Wechat:13386259279Wechat QR code

gogogo高清完整版_gogogo在线高清免费完整版_GOGOGO免费国语完整版_gogogo高清在线观看_gogogo手机高清在线观看_GOGOGO高清在线完整版_GOGOGO在线高清免费完整板_GOGOGO高清在线播放免费观看_GOGOGO免费高清完整版_GOGOGO免费完整国语_GOGOGO免费完整国语版_GOGOGO高清在线播放免费观看如果奔跑是湘